datapipeline
What will be the code nedded to link two BDE pipelines.
I tried with this code but it's not getting triggered
bdepipeline2.masterdatapipeline:=bdepipeline1;
bdepipeline2.masterFieldLinks:=;
But same setting if we are doing visually in BDE pipeline control
it's getting triggered.Please tell me the code to do it
--- posted by geoForum on http://delphi.newswhat.com
I tried with this code but it's not getting triggered
bdepipeline2.masterdatapipeline:=bdepipeline1;
bdepipeline2.masterFieldLinks:=;
But same setting if we are doing visually in BDE pipeline control
it's getting triggered.Please tell me the code to do it
--- posted by geoForum on http://delphi.newswhat.com
This discussion has been closed.
Comments
---------------------------------------------------------
Tech Tip: Define Master/Detail DataPipeline Links in Code
---------------------------------------------------------
Defining a Master/Detail relationship for a DataPipeline
requires that the detail pipeline have the
following properties defined:
1. MasterDataPipeline
2. MasterFieldLinks
At Delphi design-time you can use the object inspector
and the DataPipeline's FieldLinks editor to define
the master/detail relationship.
The following example illustrates how to define the
master/detail relationship dynamically at run-time.
var
lFieldLink: TppMasterFieldLink;
begin
{define the master/detail pipeline relationship}
plDetail.MasterDataPipeline := plMaster;
{create a new field link }
lFieldLink := TppMasterFieldLink.Create(nil);
lFieldLink.Parent := plDetail;
{assign the detail field name}
lFieldLink.DetailFieldName := 'CustNo';
{assign the master field name}
lFieldLink.MasterFieldName := 'CustNo';
end;
Note: The DataPipeline linking requires the records in the detail dataset to
be ordered by the linking fields. In the above example, the detail data must
be ordered by CustNo.
--
Regards,
Nico Cizik
Digital Metaphors
http://www.digital-metaphors.com
Nico Cizik
Digital Metaphors
http://www.digital-metaphors.com